Periodicity.: Special Edition IFLOG-2017, July - 2018
e-ISSN......: 2236-269X
Cover Image

The process timeline for sustainable construction management: case study in the construction of an educational centre

Thais Taba da Silva, Márcio Rodrigues Clementino, Adriano Maniçoba da Silva, Wilson Yoshio Tanaka, Eugenio de Felice Zampini

Abstract


Entrepreneurship is hard work, especially when it comes to the creation of an innovative, ecologically correct and sustainable project, and the small entrepreneur, in addition to facing bureaucratic and fiscal obstacles, has great difficulty in running his business, planning and optimizing his production for lack structured management knowledge. This is what happens with the company studied, where the construction of an educational centre, thought to be a model of ecological and sustainable building, did not have a schedule of execution, thus becoming dependent on very short term planning, accomplished at each step, rather than a structured action as a whole. In this sense, the Critical Path Method (CPM), which uses simple estimates for the duration of the building stages and the PERT technique, was implemented among a variety of schedules and methods for planning and control of works execution. This method is suitable and simple to use by small businesses. This methodology, easy to be understood and implemented, generated benefit to the company, allowing planning, predictability and control of the works.

Keywords


planning; control; sustainability; CPM; PERT

Full Text:

PDF HTML

References


AIRO - Associação Empresarial (2015) Manual de Empreendedorismo Social: uma abordagem sistémica. Avaliable: https://www.igfse.pt/upload/docs/2015/Manual_Resumido.pdf. Access: 20/12/2016.

BRITO, D. M.; FERREIRA, E. D. A. M. (2015) Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D. Ambiente Construído, v. 15, n. 4, p. 203-223. Avaliable: http://seer.ufrgs.br/index.php/ambienteconstruido/article/view/54223/35126

CODAS, M. M. B. (1987) Gerência de projetos: uma reflexão histórica. Revista de Administração de Empresas, v. 27, n. 1, p. 33-37. Avaliable: http://www.scielo.br/scielo.php?pid=s0034-75901987000100004&script=sci_arttext

COELHO, H. O. (2004) Diretrizes e requisitos para o planejamento e controle da produção em nível de médio prazo na construção civil. Dissertation (Master in Construction Engineering) UFRGS. Avaliable: http://hdl.handle.net/10183/5228. Access: 25/12/2016.

FÉLIX, S.; ALVES, L.; SIRGHI, V. (2012) Manual do Empreendedorismo Social: uma abordagem sistémica. Avaliable: http://www.igfse.pt/upload/docs/2015/ManualEmpreendedorismoSocial.pdf. Access: 30/11/2016

GIL, A. C. (2002) Como elaborar projetos de pesquisa. 4 ed. São Paulo, Atlas, p. 54,

MIRANDA, C. M. G.; FERREIRA, R. J. P.; GUSMÃO, A. P. H.; ALMEIDA, A. T. (2003) Sistema de apoio a decisão para seleção de atividades críticas no gerenciamento de projetos com avaliação multicritério. Revista Produção Online, v. 3, n. 4. Avaliable: https://producaoonline.org.br/rpo/article/view/575/621.

MOTA, A. A.; ROCHA, A. M.; FLEURY, A.L.; ZANCUL, E. S. (2015) Aplicação da abordagem do Design Thinking em um projeto de desenvolvimento de produto de tecnologia assistida. XXXV ENEGEP - Encontro Nacional de Engenharia de Produção, Fortaleza. Avaliable: http://www.abepro.org.br/biblioteca/TN_STO_210_247_27254.pdf. Access: 30/12/2016.

OLIVEIRA, E. M. (2004) Empreendedorismo social no Brasil: atual configuração, perspectivas e desafios–notas introdutórias. Revista da FAE, v. 7, n. 2, p. 9-18, jul./dez. Avaliable: https://revistafae.fae.edu/revistafae/article/view/416. Access: 30/11/2016.

PEINADO, J.; GRAEML, A. R. (2007) Administração da produção. Operações industriais e de serviços. Unicenp.

SILVA JÚNIOR, A. D. S. S.; SANTOS, C. T. (2015) A Gestão de Cronograma em Empresas de Engenharia Civil: Um Estudo sobre os Fatores Determinantes. Revista de Gestão e Projetos-GeP, v. 6, n. 1, p. 111-124.

YIN, R. K. (2013) Estudo de Caso: Planejamento e Métodos. Bookman editora.




DOI: http://dx.doi.org/10.14807/ijmp.v9i5.809

Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 Thais Taba da Silva, Márcio Rodrigues Clementino, Adriano Maniçoba da Silva, Wilson Yoshio Tanaka, Eugenio de Felice Zampini

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

LIBRARIES BY

Logo Gaudeamus

Logo INDIANA

Logo CHENG KUNG

Logo UTEP

Logo MOBIUS

Logo UNIVEM

Logo Kennedy

Logo Columbia

Logo UCS

Logo MSG/UFF

Logo OPT

Logo Biblioteca Professor Milton Cabral Moreira

Logo UFL

Logo ULRICHSWEB

Logo UNISA