Assessment of bonds utilisation in the Nigerian construction industry
Main Article Content
Abstract
Downloads
Article Details
1. Proposal of Policy for Free Access Periodics
Authors whom publish in this magazine should agree to the following terms:
a. Authors should keep the copyrights and grant to the magazine the right of the first publication, with the work simultaneously permitted under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 that allows the sharing of the work with recognition of the authorship of the work and initial publication in this magazine.
b. Authors should have authorization for assuming additional contracts separately, for non-exclusive distribution of the version of the work published in this magazine (e.g.: to publish in an institutional repository or as book chapter), with recognition of authorship and initial publication in this magazine.
c. Authors should have permission and should be stimulated to publish and to distribute its work online (e.g.: in institutional repositories or its personal page) to any point before or during the publishing process, since this can generate productive alterations, as well as increasing the impact and the citation of the published work (See The Effect of Free Access).
Proposal of Policy for Periodic that offer Postponed Free Access
Authors whom publish in this magazine should agree to the following terms:
a. Authors should keep the copyrights and grant to the magazine the right of the first publication, with the work simultaneously permitted under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 [SPECIFY TIME HERE] after the publication, allowing the sharing of the work with recognition of the authorship of the work and initial publication in this magazine.
b. Authors should have authorization for assuming additional contracts separately, for non-exclusive distribution of the version of the work published in this magazine (e.g.: to publish in institutional repository or as book chapter), with recognition of authorship and initial publication in this magazine.
c. Authors should have permission and should be stimulated to publish and to distribute its work online (e.g.: in institutional repositories or its personal page) to any point before or during the publishing process, since this can generate productive alterations, as well as increasing the impact and the citation of the published work (See The Effect of Free Access).
d. They allow some kind of open dissemination. Authors can disseminate their articles in open access, but with specific conditions imposed by the editor that are related to:
Version of the article that can be deposited in the repository:
Pre-print: before being reviewed by pairs.
Post-print: once reviewed by pairs, which can be:
The version of the author that has been accepted for publication.
The editor's version, that is, the article published in the magazine.
At which point the article can be made accessible in an open manner: before it is published in the magazine, immediately afterwards or if a period of seizure is required, which can range from six months to several years.
Where to leave open: on the author's personal web page, only departmental websites, the repository of the institution, the file of the research funding agency, among others.
References
ADEWUYI, T. O.; ODESOLA, I. A. (2015) Factors affecting material waste on construction sites in Nigeria. Journal of Engineering and Technology, v. 6, n.1, p. 82- 99
AJE, I. O.; MAKANJUOLA, S. A.; OLATUNJI, O. A (2015). Assessment of factors affecting bid-no-bid decision of construction contractors in Nigeria. In: OGUNSEMI, D. R.; AWODELE, O. A.; OKE, A. E. (Eds.), Proceedings of the 2nd Nigerian Institute of Quantity Surveyors Research Conference. Federal University of Technology, Akure, p. 529-536
AKINTOYE, A. (2000) analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18, p. 77-89
BOND GUARANTEE GROUP, INC. Retrieved on (6th June 2018) from: http://www.bondguarantee.com/suretybond/contractbond.html
BOSWALL, R. G. (2010) Construction Bonds Guide. Clark Wilson LLP, Retrieved on (8 August, 2017) from https://www.cwilson.com/app/uploads/2010/09/construction-bonding-guide.pdf.
DANIEL, A. (1998) Construction news, “Secure the right bond”. London Daniel Atkinson
DENG, H.; DING, S.; TIAN, Q. (2004) Reasons underlying a mandatory high penalty construction contract bonding system. Journal of Construction Engineering and Management, v. 13, n. 1, p. 67-74
ENTRUSTY GROUP (2005). What is a performance bond, its purposes and implications? Retrieved on (10th June 2018) from http://entrusty.com/site/wp-content/uploads/2012/08/what-is-performance-bond-its-purposes-and-implications..pd
FELLOWS, R. R.; LIU, A. (2008) Research Methods for Construction, 3rd Edition. Wiley- Blackwell Science, London
GIWA-OSAGIE, O. (2018) Nigeria: The Legal Nature of Bonds in Commercial Transactions in Nigeria. Retrieved on (21st November, 2018) from: http://www.mondaq.com/Nigeria/x/756142/Securities/The+Legal+Nature+of+Bonds+in+Commercial+Transactions+in+Nigeria
HARRELL, J. (2003) Contractor associations ask state to lower retainage. The Daily Reporter (Milwaukee), 10th September, 2003
HASSAN, A. A.; ADNAN, H. (2018) The problems and abuse of performance bond in the construction Industry. IOP Conference. Series: Earth and Environmental Science, 117, p. 1-7
HENRY, A.O.; AMMAR, K. (2005) An evaluation of contractors’ satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, v.10, n.3, p.171-180, https://doi.org/10.1108/13664380580001074
HINCHEY, J. W. (1986) Payment and performance bond coverages and claims. The Arbitration Journal, v. 14, n. 2, p. 25-33
HUANG, Y. (2008) the pricing of conditional performance guarantees with risky collateral, Construction Management and Economics, v. 26, p.967 - 978.
JACK, R.; SIMON, B.; PHIL, G. (2006) Contract Practice Procedures. (4 Ed.), Oxford, Butterworth-Heinemann Publishers
KANGARI, R.; BAKHEET, M. (2001) Construction surety bonding. Journal of Construction Engineering and Management, v. 127, n. 3, p. 232-238.
MALLESSON, S. J. (2003) Performance bonds; Asian project construction update. Available in http//:www.mallesons.com.
MCLYNTRE, M.; STRISACHEK, D. (2005) Surety bonding in today’s construction market changing Lines for contractor’s bankers & sureties. RMA Journal. Available in http://www.findarticles.com & http://sio/org/index/html.
MEHMET, E. B.; QINGBIN, C.; MAKARAND, H.; ISSAM, M. (2006). Warranty bonds from the perspective of surety companies. Journal of Construction Engineering and Management, v. 34, p. 333-337
MICHAEL, T. (2003) Understanding bonds and guarantees provision in construction contracts. Available in http://www.naspb.org/information@surety.org.
MOSER, C. A.; KALTON, G. (1999) Survey Methods in Social Investigation, 2nd Edition. Gower Publishing Company Ltd, Aldershot
MUHAMMED (2012) An appraisal of bonds’ utilization in Nigerian construction industry (a case study of Abuja). Unpublished dissertation (BSc in Quantity surveying), Federal University of Technology Minna, Nigeria.
MURDOCH, J.; HUGHES, W. (2000) Construction contracts law and management. 2nd edition, Kath Reynolds London.
NDEKUGRI, I.; RYCROFT, M. (2009) the JCT 05 Standard Building Contract Law and Administration, (2nd ed.), United Kingdom, Butterworth-Heinemann Publisher
OGUNSEMI, D. R.; AJE, I.O. (2006) A model for contractor selection in Nigeria. Journal of Financial Management of Property and Construction, v.11, n.1, p. 33-44
OJO, A. E. (2011). Why do clients require construction bonds? Construction Connects, OJ Connects Resources, v.1, p.1- 4
OKE, A. (2016) Comparative analysis of the impacts of risks on bonded and unbonded construction projects. Engineering & the Built Environment Journal. Retrieved on (8 August 2018) from: http://hdl.handle.net/10210/223633
OKE, A. E. (2013) Benefits and level of using retention bond for construction projects in nigeria. International Journal of Architecture, Engineering and Construction, v.2, n.2, p. 98-105
OKE, A. E.; OGUNSEMI, D. R. (2016) Structural equation modelling of construction bond administration. Journal of Financial Management of Property and Construction, v. 21, n. 3, p. 192-211.
OKE, A.; OGUNSEMI, D.; OGUNLANA, S.; AJE, O. (2015) An overview of usage and management of construction bonds in Nigeria. In: ALUKO, B.T., ODEYINKA, H.A., AMOLE, O.O., ADEMULEYA, B. A. & DARAMOLA, O.P (Eds.). Proceedings of Environmental design and management international conference, Obafemi Awolowo University,Ile-Ife, Osun State, p. 183-192.
OKE, A.; OGUNMOLA, P. (2014) Retention bond and performance of construction projects in Nigeria. Journal of Construction Project Management and Innovation, v. 4, n. 1, p, 721-733.
OKE, A.E.; OGUNSEMI, D. R.; AJE, I. O.; OGUNDIMU, A. F. (2013). Effect of Bid Bond on Construction Project Performance in Nigeria. In: Laryea, S. & Agyepong, S.A. (Eds), Proceedings of the West Africa Built Environment Research (WABER) Conference 12-14 August 2013, Accra, Ghana, p. 407-418.
ROBINSON N. M.; LAVERS, A.P.; TAN, G.K.H.; CHAN, R. (1996) Construction law in Singapore and Malaysia. 2nd edition Singapore; Butterworth Asia.
SAIDU, I.; SHAKANTU, W. M. (2016) The contributions of material waste to project-cost overrun in Abuja, Nigeria. Acta Structilia, v. 23, n.1, p. 99-113
SUPARDI, A.; ADNAN, H.; YAAKOB, J. (2011) Legal comparison between conditional and unconditional on performance bond in Malaysian construction contract. International Surveying Research Journal (ISRJ), v. 1, n. 1, p. 45-55
SWEET, J. (2002) legal aspect of Architecture, engineering and the construction process. 6th Ed. United states of America; Brooks/ Cole publishing company.
TCYOUNG, (2017) Conditional performance bonds v on demand performance bonds. Retrieved on (8th August 2018) from: https://www.tcyoung.co.uk/blog/2017/commercial/conditional-bonds-performance-bonds
The surety & Fidelity Association of America, SFAA. The importance of surety bonds in construction. Available on: https://suretyinfo.org/?wpfb_dl=149